April 25, 2024

Louisiana Scientists Are Still Reeling from Ida

The biggest loss, he says, was most likely in the regional biocontainment lab, a biosafety level 3 (BSL3) laboratory where the generator failed and many reagents and samples kept in freezers will need to be replaced. “Theres still no power or water or restrooms or anything like that down there,” says Archer. A Facebook post composed by Craig McClain, executive director at LUMCON, states that many workplaces and dormitories sustained substantial damage from wind and water, however the labs, auditorium, and library were left mostly undamaged. Yesterday was my very first chance to examine the damage considering that losing contact with the marine centers determines and electronic cameras … Read more https://t.co/Ob1CIc7Zgk pic.twitter.com/GqpL3Psfko— LUMCON (@LUMCONscience) September 1, 2021Jacqueline Guendouzi, a linguist and the head of Southeastern Louisiana Universitys Communication Sciences and Disorders Department, says that the main school still does not have power, and while a generator seems to have avoided damage in the biology structure, the one powering the chemistry and physics building didnt endure the storm. The next day, he followed up to say he was on his way house from Florida– where he d evacuated to– as he was told the power had actually returned to his house in New Orleans.Members of the advisory board at LUMCON set up a fundraising event to help personnel whose homes were damaged or ruined.

A Facebook post written by Craig McClain, executive director at LUMCON, says that many offices and dorms sustained significant damage from wind and water, however the laboratories, auditorium, and library were left mostly undamaged. Yesterday was my very first opportunity to assess the damage since losing contact with the marine centers assesses and video cameras … Read more https://t.co/Ob1CIc7Zgk pic.twitter.com/GqpL3Psfko— LUMCON (@LUMCONscience) September 1, 2021Jacqueline Guendouzi, a linguist and the head of Southeastern Louisiana Universitys Communication Sciences and Disorders Department, states that the primary campus still doesnt have power, and while a generator seems to have actually prevented damage in the biology structure, the one powering the chemistry and physics building didnt hold up against the storm. The next day, he followed up to state he was on his method home from Florida– where he d left to– as he was informed the power had returned to his home in New Orleans.Members of the advisory board at LUMCON set up a fundraiser to help staff whose houses were damaged or damaged.