November 2, 2024

Sierra Space’s Dream Chaser Spaceplane: Revolutionizing ISS Resupply for NASA

Illustration of Sierra Spaces very first Dream Chaser, called DC # 1 (Tenacity). The Dream Chaser spacecraft, established by Sierra Space for NASA, is getting ready for a 2024 presentation objective to the ISS, concentrating on freight shipment and in-orbit certification. Credit: Sierra SpaceNASA and Sierra Spaces Dream Chaser spacecraft is set for a 2024 presentation flight to the ISS, including cargo shipment and numerous in-orbit tests to guarantee its operational readiness for future missions.NASA and Sierra Space are making progress on the very first flight of the businesss Dream Chaser spacecraft to the International Space Station. The uncrewed cargo spaceplane is planned to launch its presentation objective in 2024 to the orbital complex as part of NASAs commercial resupply services.Dream Chaser and Shooting StarThe Dream Chaser freight system, made by Sierra Space in Louisville, Colorado, includes two major aspects: the Dream Chaser spacecraft and the Shooting Star freight module. As a lifting body spacecraft, Dream Chaser is designed to be recycled approximately 15 times, and is customized from the HL-20 spacecraft developed at NASAs Langley Research Center in Hampton, Virginia.The spaceplanes freight module companion, Shooting Star, is designed to support delivery and disposal of unpressurized and pressurized freight to and from the spaceport station. When and is disposed of previous to re-entry, the freight module can be utilized only. The Dream Chaser system will launch with its wings folded inside a five-meter fairing aboard a ULA (United Launch Alliance) Vulcan Centaur rocket from Space Launch Complex 41 at Cape Canaveral Space Force Station in Florida. The fairing panels will safeguard the spacecraft throughout ascent but are jettisoned as soon as in orbit. Solar selections installed on the freight module and wings of Dream Chaser are released during its autonomous rendezvous to the space station. In the occasion of a scrub, Dream Chaser is designed to be prepared for launch in just 24 hours.NASA and Sierra Space are making development on the first flight of the businesss Dream Chaser spacecraft to the International Space Station. The uncrewed cargo spaceplane is prepared to launch its presentation objective in 2024 to the orbital complex as part of NASAs commercial resupply services. Credit: Sierra SpaceMission OverviewDuring its very first flight, Sierra Space will perform in-orbit presentations to license Dream Chaser for future missions. Groups at NASAs Kennedy Space Center in Florida, NASAs Johnson Space Center in Houston, and the Dream Chaser Mission Control Center in Louisville, Colorado, will keep track of the flight. Sierra Space flight controllers will control the Dream Chaser spacecraft on the launch pad up until the spacecraft is handed over to the Sierra Space ground operations team at NASA Kennedy following landing.Far-field presentations will be carried out outside the vicinity of the area station before the spacecraft enters the technique ellipsoid, a 2.5-by-1.25-by-1.25-mile (4-by-2-by-2-kilometer) undetectable boundary around the orbiting lab. These demonstrations will be needed before Dream Chaser can get in joint operations with the NASA group at the Mission Control Center in Houston. These include showing mindset control, translational maneuvers, and abort capabilities.Near-field demonstrations, which should occur closer to the spaceport station, consist of activating and utilizing light detection and ranging (LIDAR) sensors, responding to commands sent out from the space station, pulling away from the station when commanded, and holding its method, initially at 1,083 feet (330 meters), then 820 feet (250 meters), and finally, at 98 feet (30 meters) from the station. Following successful completion of the presentations, Dream Chaser will move towards the area station.As Dream Chaser approaches the orbiting lab, it will hold a last time roughly 38 feet (11.5 meters) from the spaceport station, when a station crew member will use Canadarm2 robotic arm to grapple a fixture on the spacecrafts cargo module before groups on the ground install the cargo module to an Earth-facing port on the Unity or Harmony module.On its first flight to the International Space Station, Dream Chaser is arranged to deliver over 7,800 pounds of freight. On future objectives, Dream Chaser is being developed to remain connected to the station for as much as 75 days and provide as much as 11,500 pounds of freight. Cargo can be loaded onto the spacecraft as late as 24 hours prior to launch. Dream Chaser can return over 3,500 pounds of cargo and experiment samples to Earth, while over 8,700 pounds of garbage can be gotten rid of throughout reentry utilizing its cargo module.Return to EarthDream Chaser will remain at the spaceport station for about 45 days before it is uninstalled utilizing Canadarm2. The spacecraft can land as quickly as 11 to 15 hours after departure, and there are day-to-day chances if weather condition requirements are satisfied. Landing weather condition criteria for Dream Chaser generally need crosswinds at less than 17.2 miles per hour (15 knots), headwinds under 23 mph (20 knots), and tailwinds below 11.5 miles per hour (10 knots). Thunderstorms, lightning, and rain within a 20-mile radius of the runway or 10 miles along the approach path are not appropriate conditions for landing. Detailed flight guidelines will guide controllers in determining whether landing opportunities are favorable.A mix of Dream Chasers 26 reaction control system thrusters will fire to devote the spacecraft to deorbit. Dream Chaser will re-enter Earths atmosphere and slide to a runway landing at Kennedys Launch and Landing Facility in the design of NASAs area shuttle bus, becoming the very first spacecraft to land at the facility considering that the last space shuttle flight in 2011. When Dream Chaser is powered down after landing, the Sierra Space ground operations group will move it to the Space System Processing Facility to perform required inspections, off-load remaining NASA cargo, and begin the procedure of preparing it for the next mission.Sierra Space, previously Sierra Nevada Corporation, was chosen in 2016 as NASAs 3rd industrial freight resupply spacecraft to service the International Space Station.

Credit: Sierra SpaceNASA and Sierra Spaces Dream Chaser spacecraft is set for a 2024 presentation flight to the ISS, involving cargo shipment and various in-orbit tests to guarantee its functional preparedness for future missions.NASA and Sierra Space are making progress on the first flight of the companys Dream Chaser spacecraft to the International Space Station. Sierra Space flight controllers will manage the Dream Chaser spacecraft on the launch pad until the spacecraft is handed over to the Sierra Space ground operations team at NASA Kennedy following landing.Far-field demonstrations will be performed outside the vicinity of the area station before the spacecraft goes into the method ellipsoid, a 2.5-by-1.25-by-1.25-mile (4-by-2-by-2-kilometer) unnoticeable limit around the orbiting lab. Following effective conclusion of the demonstrations, Dream Chaser will move towards the space station.As Dream Chaser approaches the orbiting laboratory, it will hold a final time approximately 38 feet (11.5 meters) from the space station, when a station crew member will utilize Canadarm2 robotic arm to grapple a component on the spacecrafts cargo module before groups on the ground install the cargo module to an Earth-facing port on the Unity or Harmony module.On its very first flight to the International Space Station, Dream Chaser is arranged to deliver over 7,800 pounds of freight. As Soon As Dream Chaser is powered down after landing, the Sierra Space ground operations team will move it to the Space System Processing Facility to carry out required evaluations, off-load remaining NASA freight, and start the process of preparing it for the next mission.Sierra Space, previously Sierra Nevada Corporation, was selected in 2016 as NASAs 3rd industrial freight resupply spacecraft to service the International Space Station.